Case Studies

  • Whispr-7 by PowerPlus

    Australia’s quietest and smartest all-in-one energy cabinet

    Distributed with Expertise by DPA

    The Whispr-7 is a complete energy storage system designed to make off-grid and hybrid installations easier, quieter, and more reliable. Built with installer convenience in mind, it arrives pre-wired, pre-tested, and ready to integrate, so you spend less time configuring and more time delivering value to your customers.

    Inside the sleek IP65-rated enclosure, you’ll find a 7kW silent-running hybrid inverter, 13.37kWh of lithium LFP storage using world-class CATL cells and smart system monitoring via desktop and mobile apps. It’s a complete home energy solution in one streamlined unit.

    7kW / 13.37kWh

    CEC listed

    Single phase

    VPP ready

    Designed by Australians, for Australian homes

    Built for Performance. Backed by Support.

    Designed in Australia for local conditions, the Whispr-7 delivers:

    • A modular battery pack design using premium CATL LFP cells
    • A wide range of input/output options to suit solar, grid, or hybrid configurations
    • CEC approval for on-grid use nationwide
    • Full compatibility with future Virtual Power Plant (VPP) participation
    • A smart, AI-powered user interface that provides real-time insight into system health and energy optimisation

    And with PowerPlus Energy’s 5+5 year warranty and DPA’s responsive support team, you can count on local backup, expert advice and reliable performance, long after the install is done.

    Smart Monitoring. Smarter Value.

    The Whispr-7 features a powerful mobile and desktop interface:

    • Track energy usage, generation and performance in real time
    • Control and optimise your system with ease
    • AI-driven app helps cut costs and boost efficiency
    • VPP-ready for future energy trading opportunities

    Flexible by Design

    The Whispr-7 is built to adapt to real-world conditions, whether you’re working with solar, grid, or hybrid systems.

    • Wide range of input/output options
    • Seamless integration into new or existing setups
    • Ideal for diverse residential applications

    More Than Just a Box

    When you source the Whispr-7 from DPA, you’re getting more than hardware. You’re backed by a team that helps you quote, sell, install and support with confidence.

    We provide practical tools, clear technical guidance and genuine commercial advice to help you win more jobs and complete them faster.

    👉 Not yet a DPA customer? Apply for an account today to access trade pricing, technical support and exclusive offers.

  • ⚡ Final Rebate Design Now Confirmed

    The structure of the Cheaper Home Batteries Program has now been finalised, with important updates published on both the CEC and CER websites.

    For installers, this marks a critical shift; the time for preparation is now over, and the time for action is here.

    At DPA Energy, we’ve reviewed the latest information and identified several key areas that will directly impact your quoting, sizing, and compliance processes. If you’re planning to participate in the program, these details are essential to get right from the start.

    ✅ DPA has reviewed the latest release and suggests checking these key sections:

    ✔️ Adding to/replacing existing battery systems (new critical information here)

    ✔️ Written Statements (extensive detail required)

    ✔️ Appropriately Sized Batteries (be careful here, check your calculations)

    ✔️ Compliance – regarding audits

    📍 What’s Next

    If you haven’t already, now is the time to:

    • Revisit your quoting and compliance processes
    • Confirm your product specs align with the eligibility rules
    • Talk to your distributor about installer-ready solutions that simplify sizing and compliance

    We’ll continue to share updates and practical tools to help you navigate the rebate with confidence.

    You can review it easily here, then follow the ‘Check Your Eligibility’ checkbox  

    Speak to DPA About Eligible Systems 03 9696 1119, sales@dpa.energy

  • 3 Smart Pre-Rebate Moves

    What Installers Can Do Now to Get Ahead Before July

    The Cheaper Home Batteries Program is just around the corner. Launching on 1 July 2025, this Federal Government initiative promises households, businesses, and community facilities a substantial discount, around 30%, on eligible small-scale battery systems. With government backing and growing interest in solar storage, this rebate season is poised to be one of the most significant sales opportunities for installers in years.


    However, as with any major launch, those who prepare early will be best positioned to benefit.
    Here are three smart moves to consider now so you’re ready to hit the ground running.


    Move 1: Lock in Your Supply Chain

    Stock availability is expected to tighten as July approaches. The rise in demand means longer lead times and potential shortages if orders are left too late.

    Securing your inventory early is a smart move to avoid delays. Connect with your DPA contact to gain a clear understanding of, pricing, stock levels and lead times and explore how to secure your orders.

    Having product on hand means you can confidently let your customers know you’re prepared for the rebate, not just waiting for it to start. This approach helps you avoid missed sales and keeps your pipeline full.


    Move 2: Get Your Messaging and Marketing Aligned

    Many end-users will need help understanding how the Cheaper Home Batteries Program works and why now is the right time to invest.

    Use this quieter pre-launch period to educate your customers. DPA is currently developing a rebate toolkit and brochure designed to help you communicate the rebate clearly and professionally. Stay tuned!

    Use straightforward language that builds trust locally. For instance, you might explain: “The government covers nearly a third of the cost upfront, so you save immediately at installation.” Clear, confident messaging like this helps customers understand their options and take action.

    Don’t forget to check if your local state offers additional rebates that can stack with the federal program; Western Australia’s scheme is a good example.


    Move 3: Quote Smarter, Not Harder

    When the rebate goes live, you don’t want to be scrambling to follow up on leads or build quotes at the last minute. Pre-load your warm prospects into your CRM so you’re ready to follow up efficiently.

    Keep your quoting process simple and transparent. Use clear visuals to show the savings the rebate offers. For example, a before-and-after cost comparison chart can make the rebate’s value obvious. Bundle your products and services into easy-to-understand packages that clearly highlight the benefits and savings for customers.

    This not only saves you time but helps customers feel confident and clear about their decision, which is essential in closing sales quickly in a competitive market.

    All the Best Brands Under One Roof, Backed by Trusted Tech Support


    Final Word: Preparation Pays Off

    The Cheaper Home Batteries Program presents a significant opportunity, but competition is expected to be fierce. Installers who start preparing now are more likely to move faster, sell more, and avoid the usual last-minute rush.

    Those who prepare early will not only win more business but also build stronger, longer-lasting customer relationships.

    If you’d like help planning your next steps or have questions about stock or the marketing tools coming soon, reach out to your DPA contact at sales@dpa.energy

    👉 Need Rebate-Ready Pricing?

    Click here to get instant access to DPA’s latest price list and plan your installs with clarity and confidence.

  • Win Big with the Battery That’s Changing the Game

    Enter to win the Ultimate All Energy Experience – the perfect moment to try Discover AES Rackmount batteries.


    Powerful. Scalable. Rebate-ready.

    Discover AES batteries are built to meet the demands of serious off-grid, backup, and hybrid solar systems and they’re eligible for the new $4,000 Federal Battery Rebate starting 1 July 2025.


    Now, when you buy 5 or more before 31 August 2025, you’ll go in the running to win the ultimate All Energy experience in Melbourne, including:

    • Return flights
    • 5-star accommodation
    • Dinner with a view at Strato Melbourne
    • A scenic helicopter ride
    • And an exclusive MCG tour for two

    Every 5 AES Rackmount batteries = 1 entry. Multiple orders? No problem: purchases are cumulative!

    Why More Installers Are Choosing Discover AES

    Built for High-Performance, Rebate-Eligible Systems

    These batteries aren’t just “compliant”, they’re optimised for demanding use cases and meet the new Federal Rebate criteria. Discover AES Rackmount (5.12 kWh, 51.2V LiFePO4) batteries offer:

    • Seamless system integration
    • Reliable performance across a wide range of conditions
    • CEC listing and full compliance with rebate standards
    • Industry-leading cycle life and warranty


    Smarter Systems with LYNK II

    Every system needs brains and that’s where LYNK II comes in.

    Discover’s LYNK II Gateway simplifies commissioning, automates dynamic charging, and provides system-wide communication. It’s not just an accessory; it’s the intelligence layer that ensures installs run smoother and smarter.


    Faster Installs with DPA Cabinets and Quick Stack Racks


    Time is money. Pair your AES Rackmount batteries with any of our Inverter/Chargers on the CEC list, DC Breakers and Cabinets, for a ‘Rebate Ready’ reliable installation and long-term performance.


    Think Beyond the Promo

    This isn’t just a giveaway, it’s your chance to trial a trusted, rebate-approved battery while elevating your install game.

    • Sell smarter with rebate-ready systems
    • Reduce call-backs and complexity
    • Support off-grid and hybrid installs with confidence
    • Scale battery capacity with ease

    And while you’re building smarter systems for your customers, you might earn a luxury trip to All Energy on the side.

    Promotion runs until 31 August 2025

    Time to Take the Next Step?

    Contact your DPA representative, visit our B2B store, or reach out for support when quoting your next rebate-ready installation.


    Terms & Conditions – Discover All Energy Competition

    1. Promoter
     The promoter is DPA Solar Pty Ltd, ABN 021 064 484 430, located at 4/273 Williamstown Rd, Port Melbourne VIC 3207.

    2. Eligibility
    Entry is open to Australian residents aged 18 years and over who are qualified business customers of DPA Energy. Employees of Discover Energy Systems, DPA, its affiliates, and their immediate families are not eligible to enter.

    3. Competition Period
     The competition runs from 12:00am AEST on 12 May 2025 and closes at 11:59pm AEST on 31 August 2025 (“Promotion Period”).

    4. How to Enter
     Eligible participants will automatically receive one (1) entry into the prize draw for every five (5) AES Rackmount 5.12kW LifePO4 batteries (CEC approved)  purchased from DPA Energy during the Promotion Period.

    • Purchases may be cumulative across multiple orders within the Promotion Period.
    • There is no limit to the number of entries per participant, provided the eligibility requirements are met.

    5. Prize Details

    • One (1) winner will be drawn.

    Prize Package Includes:

    • Return economy flights for 2 people to Melbourne Tullamarine Airport (up to $1000 per person).
    • Return transfers from Melbourne Tullamarine Airport to Oakwood Premier Hotel Melbourne.
    • 2 nights in a Deluxe Room at Oakwood Premier Hotel Melbourne (check-in 28/10/2025, check-out 30/10/2025).
    • Dinner for 2 at Strato Melbourne (up to $200 per person).
    • Helicopter experience for 2 people over Melbourne.
    • MCG Tour for 2 people.

    • The prize is not transferable, exchangeable, or redeemable for cash, unless otherwise specified.

    6. Draw, Winner Notification and Claiming Prize

    • The prize draw will take place at the offices of DPA Energy on 5 September 2025 at 12:00pm AEST.
    • The winner will be selected at random from all eligible entries.
    • The winner will be notified via email and/or phone within two (2) business days of the draw and announced on DPA Energy’s website and/or social media channels.

    Claiming the Prize

    To claim the prize, the winner must:

    • Contact: Reach out to DPA Energy via the provided contact details in the winner notification.
    • Provide Information: Submit any required documentation to verify eligibility.
    • Confirm Details: Agree to the terms and conditions associated with the prize.

    Prize Delivery

    • Arrangements: DPA Energy will coordinate with the winner to arrange the delivery or booking of the prize components, such as flights, accommodation, and experiences.
    • Timeline: All prize components will be provided within a reasonable timeframe, as specified in the terms and conditions.

    7. Unclaimed Prize
    If the prize is not claimed by 19 September 2025, a redraw will be held on 22 September 2025 at 12:00pm AEST at the same location. The new winner will be notified using the same process outlined above.

    8. Privacy
    All personal information collected will be handled in accordance with the Privacy Act 1988 (Cth) and DPA Energy’s Privacy Policy. This information is collected solely for the purposes of administering this competition.

    9. General Conditions

    • DPA Energy reserves the right to verify the validity of entries and to disqualify any individual who tampers with the entry process or breaches these Terms and Conditions.
    • DPA Energy reserves the right to modify, suspend, or cancel the competition in the event of unforeseen circumstances.
    • By entering, participants agree to be bound by these Terms and Conditions.
    • DPA Energy is not responsible for technical issues or delays outside of its control that may affect entry eligibility.
    • Inventory of the AES Rackmount is limited and supply is not guaranteed for the full Promotion Period.  Orders will be served on a first served basis.
    • This competition is in no way affiliated with, sponsored by, or endorsed by All-Energy Australia or any of its associated entities, registered businesses, or any competitions conducted by them.

    10. Contact Information
    For any queries related to this competition, please contact:
    DPA Solar Pty Ltd
    Email: sales@dpa.energy
    Phone: 03 9696 119
    Website: www.dpa.energy

  • Battery Rebate Preview: What We Know So Far And How to Get Ahead

    What Is the Cheaper Home Batteries Program?

    Backed by the Federal Government, the Cheaper Home Batteries Program is set to launch on 1 July 2025. It aims to accelerate the adoption of home battery systems by offering upfront rebates, helping homeowners, small businesses, and community facilities reduce energy costs and increase energy independence.


    Key Details

    • Launch Date: 1 July 2025
    • Total Funding: $2.3 billion
    • Rebate Value: approximately $372 per usable kWh (capped at 50 kWh)
    • Typical Savings: Up to $4,000 for an 11.5 kWh system
    • Eligibility: Homeowners, small businesses, community facilities
    • End Date: 2030 (rebates will reduce over time)


    What You Need to Know

    • The program is still being finalised; details are subject to change. We’ll keep you updated as government guidance evolves.
    • To qualify, systems must:
      • Be Virtual Power Plant (VPP) capable (on-grid only)
      • Use Clean Energy Council (CEC) approved batteries and inverters
      • Comply with AS/NZS 5139:2019 safety standards
      • Be installed by a CEC-accredited installer
      • Be paired with existing or new rooftop solar

     Note: Some states and territories, including Western Australia, may offer additional rebates. WA’s Residential Battery Scheme requires VPP participation and can be combined with the federal program. Please check your local scheme or contact your DPA representative for details.

    Note: Federal eligibility also requires systems to have a nominal storage capacity of between 5 kWh and 100 kWh.


    On-Grid vs Off-Grid Eligibility

    On-grid systems must meet all standard criteria, including VPP capability.

    Off-grid systems, however, are exempt from the VPP requirement and remain eligible if either:

    • The installation site is more than 1 km from the nearest grid line or
    • It would cost more than $30,000 to connect to the grid



    What DPA Products Are Eligible?

    DPA offers one of the broadest ranges of eligible products on the market. We’ve grouped them by use case and eligibility status.


    Batteries

    • Discover AES Rack Mount 5.12 kWh
    • Discover Helios ESS 16 kWh – CEC approval pending: expected by 1 July 2025
    • Pylontech Pelio and Pylontech US5000B
    • BYD LVL 15.4 kWh
    • PowerPlus LiFe 4838
    • BSL Battery


    Inverter/Chargers

    • Selectronic 481 & 482 (On-grid TBC, Off-grid Yes)
    • Noark Sion / Trinix series
    • Deye 1P and 3P
    • Victron 3 & 5 kVA (Off-grid only)


    Pre-Wired or Combo Systems

    • DPA ESSential Cabinet/Noark (On and Off-grid)
    • DPA ESSential Cabinet/Victron 5kVa (Off-grid)
    • Skybox Systems
    • Powerplus WhispR-7 (On-grid only – confirm VPP status)
    • Fronius Gen24 / BYD (On-grid only – confirm configuration and VPP capability)


    Important: All systems must be checked for VPP compatibility and presence on the CEC-approved product list to qualify for the rebate. More eligible models will be added over time.


    Rebate-Ready. Installer-Approved.
    These trusted brands offer compliant, high-performance solutions eligible for the Federal Battery Rebate—available now through DPA.



    What Installers Should Do Now

    1. Stay Informed

    This program is evolving. Monitor updates from the Department of Climate Change, Energy, the Environment and Water—and from DPA.

    2. Educate Customers

    Homeowners need help understanding how this rebate works—and why now is the time to act. Position yourself as a trusted energy advisor.

    3. Check Your Accreditation

    Ensure you and your team are CEC-accredited and using compliant equipment.

    4. Work With Eligible Products

    Make sure your go-to systems are VPP-ready (if on-grid), CEC-listed, and meet all rebate requirements.

    5. Prepare Your Marketing

    The rebate season will be competitive. We’re building ready-to-use marketing kits, social content, and sales collateral to help you move fast.


    DPA’s Role in Supporting You

    We’re more than a distributor—we’re your partner in maximising this opportunity. Here’s what we’re putting in place:

    • Rebate-Ready Product Range – Broad list of compliant systems, pre-wired or modular
    • Marketing Toolkit – Customisable campaign assets and brochures
    • System Config Support – Fast answers on design, compatibility, and eligibility
    • Sales Enablement – Tools that help you win, from quotes to close


    Get Ahead Now

    The opportunity is real, but so is the competition.

    If you want to lead the charge in battery storage and ride the rebate momentum with confidence, contact your DPA representative today.

    sales@dpa.energy

  • Discover All Energy Competition

    Purchase 5 or more Discover AES Rackmount Batteries before 31st August and go in the draw to WIN an incredible Melbourne prize package.

    We’re turning up the voltage with Discover All Energy, and you won’t want to miss this.

    Attending All Energy 2025?
    Purchase 5 or more Discover AES Rackmount Batteries before 31st August and go in the draw to WIN an incredible prize package including:

    Return flights to Melbourne
    Two nights 5 star accommodation at the Oakwood for two
    Dinner for two with stellar views at Strato Melbourne
    A scenic helicopter tour for two over Melbourne’s must-see landmarks
    Unforgettable MCG tour for two

    How to enter
    Eligible participants will automatically receive one (1) entry into the prize draw for every five (5) AES Rackmount 5.12kW LifePO4 batteries purchased from DPA Energy by 31 August 2025. Purchases may be cumulative across multiple orders within the Promotion Period.


    Terms & Conditions – Discover All Energy Competition

    1. Promoter
     The promoter is DPA Solar Pty Ltd, ABN 021 064 484 430, located at 4/273 Williamstown Rd, Port Melbourne VIC 3207.

    2. Eligibility
    Entry is open to Australian residents aged 18 years and over who are qualified business customers of DPA Energy. Employees of Discover Energy Systems, DPA, its affiliates, and their immediate families are not eligible to enter.

    3. Competition Period
     The competition runs from 12:00am AEST on 12 May 2025 and closes at 11:59pm AEST on 31 August 2025 (“Promotion Period”).

    4. How to Enter
     Eligible participants will automatically receive one (1) entry into the prize draw for every five (5) AES Rackmount 5.12kW LifePO4 batteries (CEC approved)  purchased from DPA Energy during the Promotion Period.

    • Purchases may be cumulative across multiple orders within the Promotion Period.
    • There is no limit to the number of entries per participant, provided the eligibility requirements are met.

    5. Prize Details

    • One (1) winner will be drawn.

    Prize Package Includes:

    • Return economy flights for 2 people to Melbourne Tullamarine Airport (up to $1000 per person).
    • Return transfers from Melbourne Tullamarine Airport to Oakwood Premier Hotel Melbourne.
    • 2 nights in a Deluxe Room at Oakwood Premier Hotel Melbourne (check-in 28/10/2025, check-out 30/10/2025).
    • Dinner for 2 at Strato Melbourne (up to $200 per person).
    • Helicopter experience for 2 people over Melbourne.
    • MCG Tour for 2 people.

    • The prize is not transferable, exchangeable, or redeemable for cash, unless otherwise specified.

    6. Draw, Winner Notification and Claiming Prize

    • The prize draw will take place at the offices of DPA Energy on 5 September 2025 at 12:00pm AEST.
    • The winner will be selected at random from all eligible entries.
    • The winner will be notified via email and/or phone within two (2) business days of the draw and announced on DPA Energy’s website and/or social media channels.

    Claiming the Prize

    To claim the prize, the winner must:

    • Contact: Reach out to DPA Energy via the provided contact details in the winner notification.
    • Provide Information: Submit any required documentation to verify eligibility.
    • Confirm Details: Agree to the terms and conditions associated with the prize.

    Prize Delivery

    • Arrangements: DPA Energy will coordinate with the winner to arrange the delivery or booking of the prize components, such as flights, accommodation, and experiences.
    • Timeline: All prize components will be provided within a reasonable timeframe, as specified in the terms and conditions.

    7. Unclaimed Prize
    If the prize is not claimed by 19 September 2025, a redraw will be held on 22 September 2025 at 12:00pm AEST at the same location. The new winner will be notified using the same process outlined above.

    8. Privacy
    All personal information collected will be handled in accordance with the Privacy Act 1988 (Cth) and DPA Energy’s Privacy Policy. This information is collected solely for the purposes of administering this competition.

    9. General Conditions

    • DPA Energy reserves the right to verify the validity of entries and to disqualify any individual who tampers with the entry process or breaches these Terms and Conditions.
    • DPA Energy reserves the right to modify, suspend, or cancel the competition in the event of unforeseen circumstances.
    • By entering, participants agree to be bound by these Terms and Conditions.
    • DPA Energy is not responsible for technical issues or delays outside of its control that may affect entry eligibility.
    • Inventory of the AES Rackmount is limited and supply is not guaranteed for the full Promotion Period.  Orders will be served on a first served basis.
    • This competition is in no way affiliated with, sponsored by, or endorsed by All-Energy Australia or any of its associated entities, registered businesses, or any competitions conducted by them.

    10. Contact Information
    For any queries related to this competition, please contact:
    DPA Solar Pty Ltd
    Email: sales@dpa.energy
    Phone: 03 9696 119
    Website: www.dpa.energy

  • Noark and Discover partner to provide first-class hybrid solar system in sunny QLD

    These homeowners located on the outskirts of Gold Coast, Queensland, envisioned a sustainable, off-grid home that provided independence from the grid while reducing their environmental footprint. Their semi-rural property, lacking town water and vulnerable to the frequent storms that affected the power grid, made grid reliability a key concern. They wanted a solution that would offer 24/7 solar power availability, grid independence, and the ability to manage increasing household costs.

    To achieve their goals, the homeowners partnered with First Choice Solar, choosing them for their local expertise and strong industry reputation. After careful research, First Choice Solar collaborated with DPA to design the ideal hybrid solar system for their needs.

    The solution featured the Noark 8 kW single-phase inverter, which could operate both in grid-tied and off-grid modes. This inverter could surge up to 16kW for 10 seconds, providing enough power to manage multiple water pumps and essential services during blackouts. It also offered online monitoring with encrypted data, allowing the homeowners to track system performance in real-time.

    In addition to the inverter, a Discover Energy Systems 21 kWh battery storage system was chosen for its affordability, high efficiency, and fast charge/discharge rates. Paired with the Noark inverter, it provided superior performance compared to standard off-grid batteries. The system came with a 10-year warranty, ensuring long-term reliability.

    The result? The hybrid system successfully met all requirements. It provided grid independence, ensured reliable power during grid outages, and future-proofed their energy needs. The ability to monitor and optimise the system remotely also gave them peace of mind, knowing they could upgrade the system in the future if needed. The result was a cost-effective and environmentally friendly solution that not only reduced their household running costs but also protected their home from disruptions caused by frequent Queensland storms.

  • Trek2Health, DPA and PowerPlus team up to power purpose

    During the Solar & Storage Live Australia event, DPA, Trek2Health, and PowerPlus Energy teamed up to raise awareness for mental health and to hold a special draw for a handmade timber surfboard. This unique board, symbolising the connection between mental health and community, was awarded to the lucky winners at A1 Solar & Electrical – Solar Gippsland.

    Trek2Health has been making significant strides in the mental health space, fostering connection and purpose through their work with ex-service people who handcraft these beautiful surfboards. Collaborating with PowerPlus Energy to support this cause has been a privilege, allowing us to start essential conversations within our industry about mental health and well-being.

    A special thanks to Shane Pollard from PPK Group Limited and our very own Jason Elmes and Derick Martins for hosting the draw and making this event a memorable success.

    DPA is proud to support initiatives that bring awareness to mental health, and we look forward to continuing our partnership with Trek2Health and PowerPlus Energy in their mission to make a positive impact.

  • Kluem Electrical installation of 3-phase off-grid power system

    The Kluem Electrical Services team recently completed an installation of a 3-phase off-grid power system for a wheat and sheep farm near York, WA. The farm, previously reliant on a diesel-powered genset for small loads, was experiencing high diesel usage and rising operational costs.

    To address these challenges, Kluem Electrical Services installed a 3-phase solution using three Selectronic SPMC482 inverters in Powerchain configuration. This setup is now the primary power source for the farm’s operations, with the inverters drawing power from a battery bank charged by PV panels. The system also features a Fronius Solar Energy 10kW Symo advanced SCERT and a 20kW Symo advanced SCERT, which ensure the battery bank—comprised of 20 PowerPlus Energy Life4838 LFP batteries housed in two 12-battery module cabinets—remains charged.

    The installation was supported by DPA, who provided the components and technical advice to ensure a smooth commissioning process.

    The result? A 90% reduction in genset run-time, delivering continuous, reliable power while drastically lowering diesel consumption and servicing costs.

  • Robotic milking operations front and centre at Willows Pastoral farm

    Richard Barker, founder of DPA, had the privilege of visiting Willows Pastoral farm for their open day. The farm proudly showcased its cutting-edge robotic milking operation alongside their newly installed PowerPlus Energy Escape 20 and Escape 60 products.

    The installation of the Escape series Battery Energy Storage System (BESS) marks a significant upgrade for Willows Pastoral. This system enables the farm to operate their SWER line without any power quality issues, ensuring reliable and consistent power for their growing operation. With this solution in place, the farm has greatly reduced its reliance on generators during blackouts and minimised the need for additional conversion equipment to run their GEA robotic milking system. Additionally, the installation has enhanced power quality for neighbouring properties during peak demand times.

    The comprehensive installation included 50kW of PV on Fronius inverters, 60kWh of LiFe 4838 batteries, and a 10kW per phase continuous output CT+E system. This setup not only guarantees consistent power supply but also future-proofs the farm’s energy needs as they continue to expand.

    The result? Willows Pastoral and PowerPlus successfully demonstrated how innovative energy solutions can support advanced agricultural operations, ensuring both efficiency and reliability.